Project |
Site |
Country |
Type |
Term of performance |
Client |
Energo Příbram |
Příbram |
Czech Republic |
fitter´s works |
2019-2020 |
MAN POWER INDUSTRY |
Slovnaft Montáže a opravy |
Bratislava |
Slovak Republic |
assembly work |
2019 |
SLOVNAFT MONTÁŽE A OPRAVY |
Třinecké železárny |
Třinec |
Czech Republic |
assembly work |
2012 |
TŘINECKÉ ŽELEZÁRNY |
Energetika Třinec |
Třinec |
Czech Republic |
replacement of SH2 of fluidized bed heat exchanger of K12 boiler |
2019 |
SES Tlmače |
SÚ Vřesová |
Vřesová |
Czech Republic |
replacement of superheater K3,4 of boiler K1 |
2019 |
SES Tlmače |
SK Hungary Batery Plant Komarom |
Komarom |
Hungary |
assembly of distribution pipelines |
2019 |
Kraftszer |
Synthesia Pardubice – Tp Zelená Louka |
Pardubice – Tp Zelená Louka |
Czech Republic |
assembly of fluidized bed of boiler K13 |
2018-2019 |
SES Tlmače |
ALPIQ Kladno |
Kladno |
Czech Republic |
replacement part of tubes front membrane wall FB5 |
2019 |
ALPIQ Generation (CZ) Kladno |
HKW Freimann |
Freimann |
Germany |
fitter´s and welder´s works |
2019 |
HKW Freimann |
AE Jaslovské Bohunice |
Jaslovské Bohunice |
Slovak Republic |
hydraulic jacks rental |
2018-2019 |
Slovenské elektrárne |
Power and Heating Plant Bratislava – west |
Bratislava |
Slovak Republic |
assembly of recirculating flue gas duct and modification of gas burners |
2018 |
SES Tlmače |
Paramo Pardubice |
Pardubice |
Czech Republic |
replacement of superheater coils |
2018 |
SES Tlmače |
EnergieLink |
Spain (Mallorca), Germany, Niederlanden, Belgien |
Switzerland |
assembly work |
2018 |
EnergieLink |
Energy Edge ZC Žarnovica |
Žarnovica |
Slovak Republic |
replacement of lower part of front wall of combustion chamber |
2018 |
PBS ENERGO |
Power Plant Nováky |
Nováky |
Slovak Republic |
repair of pulverized fuel burners of K1, K2 boilers |
2018 |
SES Tlmače |
Alpiq Kladno |
Kladno |
Czech Republic |
repair of LUVO air preheater of fluidized bed boiler K4 |
2018 |
Alpiq Generation (CZ) Kladno |
Hofor BIO4 |
Hofor |
Denmark |
assembly of LP external piping |
2017-2018 |
Hutní montáže |
SCA HELIOS |
Ӧstrand |
Sweden |
dismantling and assembly work – modification of pipelines during shutdown |
2018 |
Andritz Oy |
SÚ Vřesová |
Vřesová |
Czech Republic |
replacement of drying chambers at K5 boiler |
2018 |
SES Tlmače |
Power Plant Malženice |
Malženice |
Slovak Republic |
performance of presure tests of HRSG boiler |
2018 |
EO.N Elektrárne |
Power Plant Třebovice |
Třebovice |
Czech Republic |
dismantling and assembly work of K13 boiler |
2017 |
SES Tlmače |
EES Želiezovce |
Želiezovce |
Slovak Republic |
locksmith´s and assembly work |
2017-2018 |
Euro Energy Slovakia Holding |
SES Tlmače |
Tlmače |
Slovak Republic |
welding work |
2018 |
SES Tlmače |
Gestamp Nitra |
Nitra |
Slovak Republic |
locksmith´s and assembly work |
2018 |
AWG SLOVAKIA |
Jaguar Land Rover Nitra |
Nitra |
Slovak Republic |
assembly of heating system |
2017-2018 |
KLIMAK |
Mondi Štětí |
Štětí |
Czech Republic |
locksmith´s and assembly work |
2017 |
PBP – POWER BOILERS & PIPING |
Power Plant Opatovice |
Opatovice |
Czech Republic |
assembly of pipeline parts of recirculating flue gas lines of boilers K2, K3 |
2017 |
United Energy |
Power and Heating Plant Bratislava – east |
Bratislava |
Slovak Republic |
replacement of superheater 2 of boiler 5 |
2017 |
SES Tlmače |
Power Plant Kilpilahti |
Kilpilahti |
Finland |
provision of assembly capacities |
2017 |
CZ MONT |
EnergieLink |
Bamberg (Germany), Lausanne (Switzerland) |
Switzerland |
assembly work |
2017 |
EnergieLink |
Pécs |
Pécs |
Hungary |
repair of pressure parts of boiler K10 |
2017 |
Pannongreen |
Power Plant Tisová |
Tisová |
Czech Republic |
replacement of superheater 3 of K9 boiler |
2017 |
Power Plant Tisová |
ALPIQ Kladno |
Kladno |
Czech Republic |
repair of LUVO air preheater of fluidized bed boiler K5 |
2017 |
ALPIQ Generation (CZ) Kladno |
ET Třinec |
Třinec |
Czech Republic |
replacement of pressure part of K12 boiler |
2017 |
Energetika Třinec |
SÚ Vřesová |
Vřesová |
Czech Republic |
replacement of drying chambers at K4 boiler |
2017 |
SES Tlmače |
Duslo Šaľa |
Šaľa |
Slovak Republic |
ammonium 4 – assembly of cooling water distribution piping |
2016-2017 |
PBP – POWER BOILERS & PIPING |
Power Plant Chvaletice |
Chvaletice |
Czech Republic |
locksmith´s and assembly work |
2016-2017 |
Královopolská RIA |
AE Mochovce |
Mochovce |
Slovak Republic |
provision of assembly capacities for units 3 and 4 |
2016-2017 |
ŠKODA SLOVAKIA |
Apollo Tyres Gyöngyös |
Gyongyos |
Hungary |
assembly of distribution pipelines |
2017 |
Kraftszér |
TE Šoštanj |
Šoštanj |
Slovenia |
modification of hot watwr boiler into steam boiler |
2016-2017 |
SES Tlmače |
EES Želiezovce |
Želiezovce |
Slovak Republic |
lifting of condenser |
2017 |
Euro Energy Slovakia Holding |
Power Plant Nováky |
Nováky |
Slovak Republic |
assembly work during K1, K2 boilers shutdown |
2017 |
SES Tlmače |
Samsung Göd |
Göd |
Hungary |
assembly work |
2017 |
Kraftszer Kft. |
Äänekoski |
Äänekoski |
Finland |
assembly of high pressure distribution piping, soot-blowers |
2016-2017 |
Hutní montáže |
Heat Power Plant Bratislava – west |
Bratislava |
Slovak Republic |
assembly of recirculating flue duct boiler HK3 |
2016-2017 |
SES Tlmače |
Bučina Zvolen |
Zvolen |
Slovak Republic |
repair of superheater leakage of boiler K4 |
2017 |
Bučina Zvolen |
PPC Počerady |
Počerady |
Czech Republic |
guarantee repairs |
2016 |
SES Tlmače |
Power Plant Opatovice |
Opatovice |
Czech Republic |
reduced emissions of NOx and solid pollutans K2,K3,K5,K6 |
2014-2018 |
SES Tlmače |
Power and Heating Plant Martin |
Martin |
Slovak Republic |
dismauntling and assembly of lower part of K6 boiler |
2016 |
SES Tlmače |
TŽ Třinec |
Třinec |
Czech Republic |
repair of lower part of flue duct of K2 boiler |
2016 |
SES Tlmače |
PPC Bratislava |
Bratislava |
Slovak Republic |
dismantling and assembly work during boiler repairs |
2016 |
SES Tlmače |
Duslo Šaľa |
Šaľa |
Slovak Republic |
replacement of boilers internals |
2016 |
ZVÚ Engineering |
Energetika Třinec |
Třinec |
Czech Republic |
installation of steam piping of K14 boiler |
2016 |
SES Tlmače |
Power and Heating Plant Bratislava – east |
Bratislava |
Slovak Republic |
replacement of superheater 2 of boiler K6 |
2016 |
SES Tlmače |
SÚ Vřesová |
Vřesová |
Czech Republic |
modification of desulphurization reactor – dismantling and assembly work |
2015 |
DIZ Bohemia |
Chvaletice |
Chvaletice |
Czech Republic |
locksmith´s and assembly work |
2016 |
CZ MONT |
Toruň |
Toruň |
Poland |
locksmith´s and assembly work |
2016 |
CZ MONT |
Nováky |
Nováky |
Slovak Republic |
assembly work during K1, K2 boilers shutdown in the course of GO 2015 |
2016 |
SES Tlmače |
Nováky |
Nováky |
Slovak Republic |
provision or technical assistence, DENOX, units 1 and 2 |
2016 |
SES Tlmače |
Power Plant Pécs |
Pécs |
Hungary |
replacement of partition wall of K10 boiler |
2016 |
Pannongreen Kft. |
SÚ Vřesová |
Vřesová |
Czech Republic |
replacement of drying chambers at K3 boiler |
2016 |
SES Tlmače |
Energetika Třinec |
Třinec |
Czech Republic |
replacement of header of steam piping of K12 boiler |
2016 |
Energetika Třinec |
Mondi SCP Ružomberok |
Ružomberok |
Slovak Republic |
repair of superheaters |
2016 |
ANDRITZ OY |
Litvínov |
Litvínov |
Czech Republic |
provision of assembly capacities |
2016 |
CZ MONT |
Třebovice |
Třebovice |
Czech Republic |
replacement of 2 pcs bent tubes |
2016 |
SES Tlmače |
Litvínov |
Litvínov |
Czech Republic |
locksmith´s work |
2016 |
ZK-Termochem |
Litvínov |
Litvínov |
Czech Republic |
provision of assembly capacities |
2016 |
IDS ENERGY PIPING |
Třebovice |
Třebovice |
Czech Republic |
replacement of burner |
2016 |
SES Tlmače |
Water Works Gabčíkovo |
Gabčíkovo |
Slovak Republic |
installation of control valve 1 |
2016 |
SES Tlmače |
Slovnaft Bratislava Montáže a opravy |
Bratislava |
Slovak Republic |
replacemont of ECO |
2016 |
Slovnaft Bratislava Montáže a opravy |
ArcerolMittal Ostrava |
Ostrava |
Czech Republic |
dismantling and assembly work during shutdown of K9 |
2015-2016 |
ČKD Praha DIZ |
Žilinská teplárenská |
Žilina |
Slovak Republic |
reduced emissions of NOx K1, K2, K5 |
2014-2016 |
SES Tlmače |
AE Mochovce |
Mochovce |
Slovak Republic |
provision of assembly capacities for units 3 and 4 |
2015 |
ENERGOINVEST Bratislava |
Belchatow |
Belchatow |
Poland |
provision of locksmith and assembly works |
2015 |
CZ MONT |
EES Želiezovce |
Želiezovce |
Slovak Republic |
lifting of condenser |
2015 |
Euro Energy Slovakia Holding Senec |
AVE Kralupy |
Kralupy |
Czech Republic |
replacement of ECO |
2015 |
SES Tlmače |
Bučina Zvolen |
Zvolen |
Slovak Republic |
replacement of superheater 2 coils of K3 boiler |
2015 |
Bučina Zvolen |
Duslo Šaľa |
Šaľa |
Slovak Republic |
assembly of recirculation piping K6, K7 |
2015 |
SES Tlmače |
Attero BV Moerdijk |
Moerdijk |
Netherlands |
assembly assistance |
2015 |
I&E Services |
Mondi SCP Ružomberok |
Ružomberok |
Slovak Republic |
assembly works on RB3 during shutdown |
2015 |
ANDRITZ OY |
ZEVO Chotíkov |
Chotíkov |
Czech Republic |
assembly of pressure parts of boiler for firing municipal waste |
2014-2015 |
ČKD Praha DIZ |
SÚ Vřesová |
Vřesová |
Czech Republic |
replacement of driers K2 |
2015 |
Sokolovská uhelná |
Energetika Třinec |
Třinec |
Czech Republic |
replacement of hanging tubes and nozzle K11 |
2015 |
SES Tlmače |
Alpiq Kladno |
Kladno |
Czech Republic |
service |
2015 |
Alpiq Generation Kladno |
Energetika Třinec NK14 |
Třinec |
Czech Republic |
assembly of fluidized bed boiler NK14 |
2014-2015 |
SES Tlmače |
Počerady PPC 880 MWe |
Počerady |
Czech Republic |
modification of technologic equipment |
2014-2015 |
SES Tlmače |
Prunéřov II OB05 |
Prunéřov |
Czech Republic |
assembly of piping in turbine hall of unit C |
2013-2015 |
TENZA |
Prunéřov II OB61 |
Prunéřov |
Czech Republic |
assembly of inner connecting piping of units D and E |
2013-2015 |
Energetické opravny |
Energetika Třinec |
Třinec |
Czech Republic |
replacement of pressure part K11 |
2014 |
SES Tlmače |
Tepláreň Zlín |
Zlín |
Czech Republic |
repair of superheater 2 K32 |
2014 |
SES Tlmače |
Power Plant Třebovice |
Třebovice |
Czech Republic |
disassembly of boiler K14 |
2014 |
SES Tlmače |
Energetika Třinec |
Třinec |
Czech Republic |
replacement of SH2 and inlet header of fluidized bed heat exchanger of K12 boiler |
2014 |
SES Tlmače |
SÚ Vřesová |
Vřesová |
Czech Republic |
DENOX and replacement of driers K1 |
2014 |
SES Tlmače |
Počerady PPC 880 MWe |
Počerady |
Czech Republic |
replacement of expansion joints at PPC |
2014 |
SES Tlmače |
SSM Strážske |
Strážske |
Slovak Republic |
replacement of water duct |
2014 |
SES Tlmače |
Slovnaft Bratislava |
Bratislava |
Slovak Republic |
assembly of catalyst K4, K5 |
2014 |
SES Tlmače |
Power Plant Studstrup- vaerket |
Studstrup- vaerket |
Denmark |
replacement of steam superheaters and reheaters |
2014 |
Burmeister Wein Energy |
TŽ Třinec |
Třinec |
Czech Republic |
assembly of hood K1 |
2014 |
SES Tlmače |
TŽ Třinec |
Třinec |
Czech Republic |
replacement of hood K2 |
2013 |
SES Tlmače |
Water Works Gabčíkovo |
Gabčíkovo |
Slovak Republic |
assembly of control gate 7 |
2013 |
SES Tlmače |
SÚ Vřesová |
Vřesová |
Czech Republic |
replacement of ECO K5 |
2013 |
SES Tlmače |
SÚ Vřesová |
Vřesová |
Czech Republic |
assembly of Denox K5 |
2013 |
SES Tlmače |
Wilburgstetten |
Wilburgstetten |
Germany |
replacement of ECO 1,2,3, superheater 1-3 |
2013 |
SES Tlmače |
Power Plant Ledvice |
Ledvice |
Czech Republic |
assembly of supercritical 660 MW boiler |
2010-2013 |
AlstomPower Stuttgart |
Power Plant Počerady |
Počerady |
Czech Republic |
assembly of HRSG 2 x 440 MW |
2011-2013 |
ŠPI Praha |
Slovnaft Bratislava |
Bratislava |
Slovak Republic |
assembly of 2 x 160 t/h boilers |
2010-2013 |
MOL Plc. |
Power Plant Obrenovac B1 |
Obrenovac |
Serbia |
GO of boiler B1 – 1st phase – 600 MW |
2012 |
Doosan Power System |
Power Plant Obrenovac A5 |
Obrenovac |
Serbia |
GO of boiler A5 – 300 MW |
2012 |
Doosan Power System |
Biomasa Košice |
Košice |
Slovak Republic |
assembly of boiler, combustion of biomass,20 t/h |
2012-2013 |
Košická energetická spol. |
Fundermax |
Saint Veith |
Austria |
replacement of superheater 2,3 |
2012 |
Fundermax AG |
SÚ Vrěsová – service work |
Vřesová |
Czech Republic |
service of power plant equipment |
2010-2019 |
Sokolovská uhelná |
Alpiq Kladno – service work |
Kladno |
Czech Republic |
service of power plant equipment |
2010-2014 |
Alpiq Generation Kladno |
Elektráreň Opatovice |
Opatovice |
Czech Republic |
replacement of burners and classifiers K5 |
2012 |
El. Opatovice |
Energetika Třinec K11 |
Třinec |
Czech Republic |
replacement of ejector |
2012 |
Energetika Třinec |
Energetika Třinec K12 |
Třinec |
Czech Republic |
replacement of cyclone+repair of FBHE |
2012 |
Energetika Třinec |
Hirschberg |
Hirschberg |
Germany |
replacement of ECO |
2012 |
Rettenmayer |
Tisza Power Plant – service work |
Tiszaujváros |
Hungary |
service of power plant equipment |
2010-2012 |
Tisza Eromu Kft |
SÚ Vrěsová – Denox K4 |
Vřesová |
Czech Republic |
assembly of Denox K4 -325 t/h |
2012 |
Sokolovská uhelná |
SÚ Vřesová – K4 replacement of ECO |
Vřesová |
Czech Republic |
replacement of ECO K4- 325 t/h |
2012 |
Sokolovská uhelná |
TŽ Trinec |
Třinec |
Czech Republic |
replacement of hood in steel works |
2012 |
TŽ Třinec |
Kostolac |
Kostolac |
Serbia |
supervisory assembly at replacement of pressure boiler parts, 300 MW |
2012 |
Energoprojekt Beograd |
Krnov |
Krnov |
Czech Republic |
assembly of boiler with combusion of biomass |
2009-2010 |
PBS Brno |
SÚ Vrěsová – Denox K3 |
Vřesová |
Czech Republic |
assembly of Denox K3-325 t/h |
2011 |
Sokolovská uhelná |
SÚ Vřesová – K3 replacement of ECO |
Vřesová |
Czech Republic |
replacement of ECO,K3- 325 t/h |
2011 |
Sokolovská uhelná |
Krefeld |
Krefeld |
Germany |
assembly of boiler with combustion of municipal waste |
2010-2011 |
Fisia Babcock |
Power Plant Obrenovac A6 |
Obrenovac |
Serbia |
GO of 300 MW boiler |
2010 |
Doosan Power System |
Malženice |
Malženice |
Slovak Republic |
assembly of 440 MW HRSG |
2009-2011 |
STF Spa. Taliansko |
Mallorca |
Mallorca |
Spain |
assembly of boiler with combustion of municipal waste, 2×85 t/h |
2009-2010 |
von Roll Inova |
SÚ Vřesová – Denox K2 |
Vřesová |
Czech Republic |
assembly of Denox K2- 325 t/h |
2010 |
Sokolovská uhelná |
SÚ Vřesová – EKO K2 |
Vřesová |
Czech Republic |
replacement of ECO, K2 – 325 t/h |
2010 |
Sokolovská uhelná |
Lenzing 1K6 |
Lenzing |
Austria |
GO of boiler 1K6 |
2010 |
Lenzing AG |
U.S.STEEL Košice |
Košice |
Slovak Republic |
GO of boiler K3 |
2009-2010 |
US STEEL Košice |
DALKIA Industry Žiar nad Hronom |
Žiar nad Hronom |
Slovak Republic |
service of power plant equipment |
2010 |
DALKIA Industry |
SAKO Brno |
Brno |
Czech Republic |
assembly of 2 boilers with combustion of municipal waste |
2009-2010 |
CNIM France |
Supervisory assembly |
|
Chile, Brasil, Rusia, Turkey, Cuba |
supervisory assembly at Colbun, Zonguldak, Kurgan, RNEST, Nuevitas |
2010-2011 |
|